Kazipet Landowners Want Jobs as Railway Factory Upgrades to Coach Making

The Kazipet railway factory is upgrading from wagon repairs to making modern LHB and EMU coaches, but local landowners are still waiting for promised jobs and payment for their 150 acres of land.

Paper promises for the Kazipet railway hub have hit a hard wall of dirt and old grievances. While the Railway Board shuffles labels between "wagon workshop" and "manufacturing unit," those who handed over their family soil remain without the promised pay or work.

SCR GM urged to give jobs to those gave up lands for Kazipet coach factory - 1

Vinod Kumar (BRS) has formally pressed the South Central Railway (SCR) to stop the stalling. The demand is blunt: if the land is gone, the jobs must follow. He pointed to the Latur Railway Coach Factory in Maharashtra as the blueprint—a deal where those who lost their acres got a seat at the table.

SCR GM urged to give jobs to those gave up lands for Kazipet coach factory - 2

"The factory is finally moving from a mere wagon fix-it shop to a place for making high-end LHB and EMU coaches, but the people who cleared the way are still waiting in the dust." — Paraphrased from the memorandum to GM Srivatsava.

The Manufacturing Pivot: Coaches vs. Wagons

The machinery of the Indian Railways recently twitched. On September 19, a letter went out to the SCR and Rail Vikas Nigam Limited (RVNL). It ordered them to stop thinking small. Instead of just patching up old freight cars, they are now told to plan for:

Read More: McDonald's CEO tiny bite video causes jokes and rival ads

SCR GM urged to give jobs to those gave up lands for Kazipet coach factory - 3
  • Linke-Hofmann-Busch (LHB): The modern, shiny passenger boxes that don't crumple in a wreck.

  • Electric Multiple Units (EMU): The self-moving commuter trains that run on a spark.

The state has already handed over 150 acres for this purpose. Yet, critics like K.T. Rama Rao argue the ground remains quiet, with more ink spilled on letters than sweat on the construction site.

SCR GM urged to give jobs to those gave up lands for Kazipet coach factory - 4
Project PhaseCurrent StatusThe Hold-up
Land Transfer150 Acres handed overNone (State claim)
Facility TypeUpgraded to "Manufacturing Unit"Design planning stage
Job AllocationPendingAwaiting "Latur-style" package
Local CrossingsDisputes over Overbridges (ROB)Demand for Underbridges (RUB)

Concrete Skeletons and Local Friction

The grand vision of high-speed coaches is currently blocked by local traffic. In the Warangal and Kazipet districts, the "Amrit Bharat" station upgrades are moving, but the people living near the tracks are worried about being walled in.

  • The Bridge Fight: Politicians are fighting to swap proposed Railway Overbridges (ROB) for Underbridges (RUB) at spots like Bolarum (LC 250), Turkapally, and Safilguda. They say the overbridges kill local trade and movement.

  • The Health Gap: A sum of ₹1.75 crore was allegedly set aside for the railway hospital, but the "soon" in the announcement has a hollow ring for local staff.

  • The Empty Depots: Warangal MP Kavya recently noted that the Kazipet loco running depot is running on a skeleton crew, with many vacant posts and "crew links" that need fixing to keep the current engines moving.

Background: A Promise from the Divorce

The Kazipet Coach Factory is not a new dream. It was a legal requirement written into the Andhra Pradesh Reorganisation Act (APRA) when the state split.

For years, the project has been a political football. The BRS government claims they did their part by securing the land, while the BJP-led Centre has been accused of shrinking the project's scope to a mere repair shop before the recent "manufacturing" upgrade. The tension remains: a factory on paper does not feed the people who used to farm the 150 acres it sits on.

Read More: Bhogapuram Airport land acquisition expands by 204 acres in Vizianagaram for new water and road projects

Infrastructure Pressure Points

  • Bypass Lines: Proposed routes from Nashkal to Hasanparthy are being fought by farmers who fear their fields will be sliced in two.

  • Urban Obstacles: Existing railway plans are seen as "obstacles" to the messy, natural growth of Warangal's urban sprawl.

  • The Bus Stand: A simple request for a bus hub in Kazipet remains stuck in "evaluation" despite sites being picked out months ago.

The core signal is a mismatch between federal rail strategy and the survival of the local oustee. The Railway Board wants modern coaches; the locals want the work and the crossings promised a decade ago.

Frequently Asked Questions

Q: Why are Kazipet landowners unhappy about the railway factory?
Landowners gave up 150 acres for the Kazipet railway factory but have not received promised pay or jobs. They are comparing their situation to the Latur Railway Coach Factory where displaced people got jobs.
Q: What is changing at the Kazipet railway factory?
The factory is changing from just fixing old wagons to manufacturing new LHB passenger coaches and EMU commuter trains. This upgrade was ordered by the Railway Board on September 19.
Q: What is the main problem for the people living near the Kazipet railway project?
Local residents in Warangal and Kazipet districts are worried about new railway overbridges blocking their movement and trade. They want underbridges instead, and are also concerned about delays in hospital upgrades and staff shortages at the loco depot.
Q: What is the history of the Kazipet Coach Factory project?
The Kazipet Coach Factory was promised when Andhra Pradesh split, as part of the Andhra Pradesh Reorganisation Act. The BRS government says it provided the land, while the BJP government is accused of reducing the project's scope.
Q: Are there other local issues related to the railway expansion in Kazipet?
Yes, farmers are opposing new bypass lines that could cut through their fields. There are also concerns that railway plans are hindering urban growth in Warangal, and a new bus hub for Kazipet is still under evaluation.